Prior to an employee or contractor going inside your home or business, health screening will take place. Results of screening will determine if the appointment will proceed and the type of protective equipment to be used. We appreciate our customers’ patience and flexibility as we navigate the impacts of COVID-19 together.

Need help with your NB Power bill? We can help.

N. Rate Schedules and Rate Application Guidelines


Rate Schedules and Policies Manual

N. Rate Schedules and Rate Application Guidelines

RSP N-20

   

table of contents | back

n1 | n2 | n3 | n4 | n5 | n6 | n7 | n8 | n9 | n10 | n11 | n12 | n13 | n14 | n15 | n16 | n17 | n18 | n19 | n20 | n21 | n22 | n23 | n24 | n25 | n26 | n27

next

   
Short Term Unmetered Rate Schedule
 

That category of Customers in all areas served by NB Power requiring single-phase and three-phase installations and connected for no longer than one (1) month. The installation will not be metered.

Rate

Connection Charge:

Single-Phase

Three-Phase

A. Connection to existing secondary voltage

$93.77

$93.77

     

B. Where transformer installations are required, the following
connection charges will apply:

(1) to and including
10 kVA

$136.74

$192.18

(2) 11 kVA to 15 kVA

$221.21

$276.52

(3) 16 kVA to 25 kVA

$247.31

$309.27

(4) 26 kVA to 37 kVA

$276.52

$309.27

(5) 38 kVA to 50 kVA

$309.27

$309.27

(6) 51 kVA to 75 kVA

$339.53

$481.40

(7) 76 kVA to 125 kVA

$396.04

$510.45

(8) Above 125 kVA

--

$546.61

Energy Charge:
14.09¢ per kWh of estimated consumption.

 
   